- Business Fields
- C·Master
C·Master
Optimized solution for change management using BIM
Effectively managing Revit design changes with the optimal solution

BIM Utilization Change Management Optimization Solution
Change Management
C·Master is a field-customized change management system
that addresses issues
C·Master - Personal
-
-
Revit Add-In Service for Design Change History ManagementC·Master Personal is a service optimized for Revit design change management. It addresses various issues arising during revisions in existing designs, supporting easy management of design change history for users through a range of features.
-
Revit Add-insRevit Add-In for Easy and Convenient Use
-
Verified Comparison AlgorithmQuickly verify the percentage of changes within the drawing area in Revit.
-
Check Changes in the DrawingSwiftly confirm the percentage of changes in the drawing area within Revit.
-
Detailed Change ConfirmationCheck the addition, deletion, and modification status of all patterns in the design file and verify detailed changes, including attributes, shapes, positions, angles, and more.
-
Report Generation SupportGenerate reports by providing detailed change information and 2D/3D drawing data in Excel and 3D PDF formats.
C·Master - Enterprise
-
A web service for supporting administrator decision-makingC·Master Enterprise provides analysis data of changes in Revit files on a revision basis for each project, supporting administrators in deriving insights and establishing an integrated management system for overall BIM design
-
Project-specific change managementEffectively manage multiple projects through file registration and analysis for each project.
-
Data visualizationVisualize changes by process and family, allowing for a quick overview of the change status.
-
Time-series data generationGenerate time-series data for design changes to understand the change status during specific periods.
-
Design change data analysisAnalyze design file/process-specific change data to accurately confirm the quantity of design changes.
-
Reliable settlement assuranceAccurate settlement is possible through automatic calculation of changes within the work period.
-
Analysis report generationProvide design change details in an Excel-format report to support change management